papafoxtrot
Member
I've got an assembly design that will need to be shimmed during assembly. Not knowing exactly how many shims will be needed I inserted one shim into the assembly model so the part ID would appear in the BoM. I'd like to change the quantity to AR (as required) but the software refuses to accept a non-numeric entry. Is there some way around this? Is it possible to "explode" the BoM on the drawing so it looses it's connectivity to the BoM file and then edit items?
Thanks,
Paul_F
Thanks,
Paul_F