JST
Alibre Super User
I generally do not like to be an early adopter, I have been scorched too many times doing that. And we have some issues with 2019 to suggest moving slowly, since you will never again open some designs if you have to go back.
So, how long are you going to wait before switching over, assuming you are NOT jumping right in?
There must be an optimal time in which anything that is a real problem will likely show up once a new program version goes live. (yes, even though there was a beta)
So, how long are you going to wait before switching over, assuming you are NOT jumping right in?
There must be an optimal time in which anything that is a real problem will likely show up once a new program version goes live. (yes, even though there was a beta)